-->

Thursday, August 30, 2012

Details

Have been working on getting things moved back into the new longarm room and finishing up the details.



The new lights are up, the surge suppressor and power conditioners are installed. The curtains have been hemmed.
 


The shelf with the trim work is installed.


Removed the door and installed a beaded door curtain to free up more floor space.  Plus I think I am entering the hippy phase of my life!!!  LOL



The rail has been installed.  Between the sewing room and the longarm room still have a few more things to put away.  I haven't done any quilting in a couple of months.  I think I'm going into fabric withdrawals!!!  Will post pictures of the entire room once I get everything put away.

No comments:

Post a Comment